Seudónimo Seudónimo
  • 02-06-2018
  • Mathematics
contestada

It takes 10 workers 24 hours to do a job.
Fill in the chart.

It takes 10 workers 24 hours to do a job Fill in the chart class=

Respuesta :

biggersis1968p8xgn0 biggersis1968p8xgn0
  • 02-06-2018
5 in 48 
10 in 24
20 in16
30 in12
40 in 8
50 in 4
Answer Link

Otras preguntas

Benzene and its derivatives undergo a type of substitution reaction in which a hydrogen atom is replaced by a substituent, but the stable aromatic benzene ring
Solve for x: 3/4x+5/8=4x
Are molecules packed most tightly together in a solid, liquid, gas, or plasma
I am many, but known to few. i wear many faces, but only one is true. speak my true name, and i disappear. the moment i am found, i’m no longer there. i live in
Madison deposited a total of $5,000 between two saving accounts bearing simple interest. One of the accounts has an interest rate of 4% while the other rate i
By 1835 texas was home to about 30000 american settlers known as what
What is the meaning of the allusion lisa was nostalgic about the halcyon days of summer?
the graph below shows the value of the u.s. dollar versus the Canadian dollar for the time period shown the value of the US dollar was generally
Tom is showing his work in simplifying (5.2 – 8.5) – 0.5 + 6.8. In which step did Tom make an error? Step 1:: (5.2 – 8.5) – 0.5 + 6.8 Step 2: 5.2 + (–8.5 – 0.
Describe the size, shape, & arrangement of cells for the Skeletal Muscles, Smooth Muscles, and Cardiac Muscles.