if 12 people can finish a job by 5 days how many days will be required finish the same job by 10 people

Respuesta :

ishashunnny
ishashunnny ishashunnny
  • 01-09-2020

Answer:

4

Step-by-step explanation:

12p=5d

1p=5/12

10p=4.1666

≈4 days

Answer Link

Otras preguntas

In an effort to bolster its economy while remaining responsible to the environment, what industry is Costa Rica promoting? A. hand craft trade B. ecotourism C.
When and where did the constitutional convention take place?
I need President and significant details about Thomas Jefferson. I also need his his dilemmas, his solutions, his legacy and keywords back when he was president
WILL UPVOTE ALL. Extinction of a species is always a negative impact on the Earth. True False
how does depisition glaciers, gravity , wind ,water help in rock transportation
Your friend wants to lose weight around the belly. Your friend is planning to do crunches every day to lose the weight, but is not planning on doing any other e
When the witches planned on meeting next, they planned to meet with whom
If a rectangles length is 3 more than 2 times the width and the perimeter is 24. what are the dimensions of the rectangles?
What is the number that represents C in 4c + 16 = 35?
100 shake = how many mass of the rocks???