medm0om5iebernan medm0om5iebernan
  • 01-11-2016
  • Mathematics
contestada

A construction company delivered 40 loads of concrete in 5 days.

What was their rate of work?



A.




B.




C.




D.


Respuesta :

melhunt99
melhunt99 melhunt99
  • 05-11-2016
Well 40 divided by 5 is 8 and you don't have options so I would say 8 loads a day :)
Answer Link

Otras preguntas

If a - 3= 7, then 2a - 14 =
can we store electricity from lightning?
How do you solve a system of equations by elimination when the signs are the same
In what ways did contributions from African Americans aid the struggle for abolition?
Explain 2 different ways to find the greatest common factor of 15x2y3  and 24x4y2 .
the measure of distance from one point to another is?
PLEASE HELP 20 POINTS!The sum of the x- and y-intercepts of the graph of 5x+3y = k is 32 5. Find the length of the line segment joining the x- and y-intercepts.
The resultant resistance of two resistance wires in series combination is 108 ohm and in parallel combination is 24 ohm. find the value of individual resistance
when did grass evolve?
If x= (a^2)/b, which situation would always double the value of x? (1) Doubling the value of a(2) Halving the value of a(3) Doubling the value of b(4) Halving t