A chef can finish a catering job in 4hr. His student can do the same job in 12hr. How long will it take them both to do the job if they work together

Respuesta :

shayy1616 shayy1616
  • 03-11-2021
12 divided by 4 equal 3
Ans:3hrs
Answer Link

Otras preguntas

explain the concept of racism and social Darwinism and how they relate to the policy of imperialism
Why is anthracite a better fuel than lignite?
solving equations. find value of m 2m - 1/2 = m/7 + m/2 here is a picture of the previous question
Settlement where religion was taught
what does lysosomes look like
The moon outside is very large, but you cannot see all of it. The calendar shows that the moon was invisible just less than two weeks ago. What phase is the moo
Is Siberia limited or unlimited government?
explain in your own words why the boundary between the African and Eurasian plates isn't clear
What is 144 divided by 3 and does it have a remainder
how to write 1.00 as a fraction