bpnachaul97 bpnachaul97
  • 03-12-2021
  • Mathematics
contestada

if 2 man and 3 boys can do a piece of work in 8 days then how long do 3 man and 4 boys take to do the same work

Respuesta :

annambailey1133
annambailey1133 annambailey1133
  • 03-12-2021

Answer:

hope this helps

Step-by-step explanation:

We will solve it by this way-

2 m and 3 b can do a work in 8 days.

Then 3 m and 4 b do it in how many days.

=2*3*8=3*4*x

x=2*3*8/3*4

x=2*8/4

x=2*2

x=4 days

Answer Link
CannatiSmirk
CannatiSmirk CannatiSmirk
  • 03-12-2021

Answer:

Send Them to me I'll figure it out Once They finish the job

Answer Link

Otras preguntas

five ways that you would have raised money from the colonies if you were the British.
importance of bacteria to food preservation
what is an mouse for stranger sthing.​
The path of the a rocket represented by the equation =√(25−^2 ) The path of the missile designed to intersect the path of the rocket is represented by the equat
The the best units to use for Molar Mass would be: kg/mol. True False
Perform the operation (x^2+2x+8)+(-x^2-3x-7)
what was johnsons message in his speech
Q28. In the given figure, find the value of x ​
this is due today pls help pls
A group of women seen at a diabetes clinic weighed 140, 125, 210, 245, 202, 199, 173, and 197 pounds. What is the range?