khloesmith14 khloesmith14
  • 03-03-2022
  • Mathematics
contestada

A group of workers can plant 81 acres in 9 days. What is their rate in acres per day?

Respuesta :

lilswooosh082110 lilswooosh082110
  • 03-03-2022

Answer: 9 acres.

Step-by-step explanation:

9 times 9 in 81 easy math. hope this helps :)

Answer Link

Otras preguntas

the enlightenmentwas an intellectual movement that challenged_____and_____ institutions of europe A. cultural and social B. social and political C. political an
What is the solution to the equation 2/3x-2=2/7
Tia cut a 4 meter 8 cm wire into 10 equal pieces . Marta cut a 540 cm wire into 9 equal pieces . How much longer is one of martas wires than one of tias
how do I figure out 7.68+3.18÷12=​
A batch of snack mix made of dried fruit and nuts contain 744G of nuts the ratio of nuts to dried fruit by weight is 12 to 13 how much does a batch of snack mix
Convert: 150 oz = _____ lb _____ oz ​
Evaluate the function below for x = 3. F(X)= 2X² – 4x+7
Find the distance between (-3,5) and (4,-2)
when is the day of preparation in Mexico​
Relative velocity.....Please help....​