rethabile4554 rethabile4554
  • 04-03-2022
  • Mathematics
contestada

5 men take 45hours to build a wall.how long will it take 9men working at the same wall?​

Respuesta :

Аноним Аноним
  • 04-03-2022

Answer:

25 hours

Step-by-step explanation:

It takes 5 men 45 hours to build a wall.

So, if no. of men increases by 1.8 [∴ 5 x 1.8 = 9],

then time taken reduces by that same amount.

=> 45 hours / 1.8

=> 45 / (9/5)

=> 45 x 5 / 9

=> 5 x 5

=> 25 hours

Answer Link

Otras preguntas

Why is pathos considered the weakest of the appeals?.
why is it suggested to use soap to a person suffering from bee or ant bite?​
someone plsss help - find x ​
Critically discuss how being awarded a bursary could enable you to succeed at tertiary institution.
A number divided by -9​ is -16
Ben had $40.00..he gave his brother 2/5 of the amount.how much money did Ben's brother receive?​
_Na +_Cl2 → __Naci How many moles of NaCl are created from 1.5moles Na?
The dimensions of a rectangular prism are given in the net shown. 7 inches, 3 inches, 5 inches, 3 inches, 5 inches. What is the total surface area of the rectan
Which of the following politicians did not support a policy of détente with the Soviets?
(GIVING BRAINLIST) What is the sum of the length of the longest meteor and the length of the shortest meteor? one and one eighth inches two and one eighth inche