A feature control frame must be connected to

Respuesta :

tcs1257621
tcs1257621 tcs1257621
  • 03-07-2022

Answer:

Surface Parallelism When a surface is to be parallel to a datum plane, the feature control frame is connected by a leader to the surface, or to an extension line from the surface.

Explanation:

Answer Link

Otras preguntas

A correlation coefficient is a numerical measure of the
what is carbon-14 radioactive dating used for
What are the domain restrictions of ?
Cost minimization is an appropriate strategy in which stage of the product life cycle? a.introduction b.growth c.adolescence d.decline e.retirement
Brianna's chocolate chip cookie recipe will make about 3 dozen chocolate chip cookies the recipe calls for 2 1/4 cups of flour and 3/8 cup of baking soda and Br
__________ of drivers age 16-20 who admitted to driving after taking drugs felt that they were "not high enough to cause a crash."
Raymond wants to plow a garden that is 5 feet longer than it is wide and has a total perimeter of 170 feet. what are the dimensions of his new garden
Hyperventilation during the preoxygenation phase of endotracheal intubation:
The number of counties in state a and the number of counties in state b are consecutive even integers whose sum is 110110. if state a has more counties than sta
Cellular respiration—an overview what are the phases of cellular respiration?